IMG_0070 224
Structural engineer Nicola Perandin from the London-based Arup Design Team visited the campus for a week in September 2010 and examined each and every building and piece of infrastructure.  Although the mudslide caused considerable internal damage and destroyed a lot of equipment, the only structural damage he found was an end wall of the Junior South Block that is 3cm out of vertical at the top.

Subscribe to Our Mailing List

Enter your email address to receive regular updates
Subscribe Subscribe